How to run a line trial with a new powder coating.

A structured line trial confirms appearance, application and cure on your parts before you switch production.

Steps

  1. Set the reference

    Keep the approved panel and the TDS at the line. Agree in advance which results decide pass or fail.

  2. Clean the system

    Clean the booth, hoses, guns and recovery system to avoid contamination from the previous powder.

  3. Use representative parts

    Coat parts with normal pretreatment, including difficult shapes, edges and the heaviest sections.

  4. Record application settings

    Note voltage, powder output, gun distance, line speed and film thickness readings.

  5. Measure the oven profile

    Run a data logger with probes on the parts to record metal temperature and time against the TDS cure schedule.

  6. Test the coated parts

    Compare colour, gloss and texture with the approved panel and check cure, adhesion and impact by your usual methods.

  7. Include recovered powder

    If you recycle powder, run with your normal virgin-to-recovered mix and check that appearance stays consistent.

Parameters

Cure schedule
per TDS (metal temperature and time)
Target film thickness
per TDS / your specification
Reference
Approved panel version
Records
Settings, film thickness, oven profile, test results

Common mistakes

  • Trialling only flat, easy parts.
  • Setting the oven by air temperature instead of measured metal temperature.
  • Not cleaning the system, so the old powder contaminates the trial.
  • Judging metallic or textured finishes without recovered powder in the mix.

Next step

Tell us your parts and line conditions, and we will prepare trial powder matched to your approved panel.

Request a sample
WhatsApp

Chat with our sales teamReply within one working day · UTC+8

Sales+86 158 2472 9376Sales+86 188 5021 3808